Not resolved
1.0
Details
0 comments

total waste of time ALL i am going to say/waste my time. if the below (from ME, to contractors on ANGIES LIST).

Anglie can blow it. Contractors listed by "ANGIE" either didn't show up, didn't reply, or worse.. One contractor did show up - only to say, "i don't don't do this kindda' stuff". WELL....

can anyone with ANGIES LIST fricking read?? This below list/email to prospective contractors aint detailed ENOUGH / WHAT THE *** I NEED DONE / WHAT ONE IS BEING ASKED TO PERFORM/PROVIDE JOB QUOTES:

"Hi, Rafael - Have a few projects I need done asap, please. However, the project about "the pavers", that project is to be done very last. Thank you.

Look forward to hearing from you - J.B.

Need nine (9) holes dug & placement of four (4) 'concrete pier blocks' in 4 holes - all holes to prep for assembly/installation of soon-to-arrive carport (8'x10') to arrive (carport is being assembled/installed by a company) & to plant small trees; Need placement of wire mesh fencing (20' x 32' x 40' x 12') - fencing does not require any digging/posts - will use zip ties/stakes/mallet; Need (~ 200 sq ft) area (gravel/soil) leveled, with all gravel removed & surface area level (and without medium/large-sized rocks) to prep for placement of artificial grass (already purchased/pre-cut, but will need cutting to fit small ground area of ~ 200 sq ft - grass will be secured to ground with ground spikes); Need placement of (5' x 3') wood gate (gate already purchased/built, but I need two (2) holes dug & placement of 2 wooden poles & brackets/secure gate to pole [doesn't need handle or latch/lock]; Place/secure 2 (6' x 8') pre-assembled bamboo panels (exterior), stabilizing both with ground support; Ground surface for all needed projects is gravel/soil; Need RV door (2) screens (31" x 23" & 20" x 23") replaced; Need placement of sun blackout screen at RV exterior windows & placement of RV windshield (exterior) UV shield; Will reimburse for fuel, expenses/materials; After all projects completed, need estimate for placement of concrete 4' x 12' pavers (no cement) at 8' x 20' area (surface to place pavers is soil/gravel); Need all trash/left over materials to be hauled off to dump yard; Need small propane gas grill/tank, 2 RV tires and small inflatable raft - all hauled away; Will need contractor to pick-up all needed supplies and plants at Home Depot. Thanks - J.B."

Product or Service Mentioned: Angies List Customer Care.

Reason of review: Not as described/ advertised.

Do You Have Something To Say ?
Write a review

Comments

You will be automatically registered on our site. Username and password will be sent to you via email.
Post Comment